25% New Year discount on all plans Details

Tasks and calendar · Task basics

Postponing a task (changing its date)

Changing the due date and time of a task that won’t be done in time or that’s being moved later at the customer’s request.

Where
Görevler → görev → Zamanlama → Bitiş
Who can do this
Manager, Sales manager, Sales rep
On this page 3 topics

If a customer says “Call me next week”, you don’t delete the task; you postpone it. Tasks don’t have a separate “Postpone” button; postponing means moving the task’s Due date to a new day. The task then leaves the overdue list and you’re reminded again on the new day.

Step by step

  1. Open the task

    On the Tasks screen, click the task’s name. The details panel opens.

  2. Scroll down to the “Scheduling” section

    Find the Scheduling heading in the panel. The Due date and time are shown at the top.

  3. Choose the new date

    Click the calendar icon in the date box and pick the new day.

  4. Set the time

    If a time is needed, enter it in the HH:MM box next to it. If the time doesn’t matter, turn on the “All day” switch; the time box disappears.

  5. Save

    When you change a field, a “Save scheduling” button appears at the top of the section; click it. To discard the change, click “Cancel”.

  6. Check it

    In the list, the due label shows the new date (e.g. “Tomorrow 10:00”). The red overdue label returns to normal.

Görev ayrıntı panelinin Zamanlama bölümü: Bitiş tarihi ve saati, Gün boyu anahtarı, üstte Vazgeç ve Zamanlamayı kaydet düğmeleri (desktop view)
Görev panelinde 2 Zamanlama bölümü, 3 bitiş tarihi ve takvim simgesi, 4 saat ya da “Gün boyu”, 5 değişiklikten sonra beliren “Zamanlamayı kaydet”.

What happens when you postpone?

  • The reminder is reset for the new date; the assignee gets a “Task due” notification at the new time.
  • The task moves to the new day on the calendar. If calendar sync is on, it’s also updated in the assignee’s Google, Outlook or iCloud calendar.
  • If the task is linked to a lead card, the change is written to the card’s timeline.

Dragging on the board doesn’t change the date

In Board view, moving a card to another column only changes its status (e.g. To do → Waiting). Tasks can’t be dragged on the calendar either; only calendar notes can be moved by dragging. To change the date, always use the Scheduling section.

Tip

If you’re postponing because you’re waiting for a reply from the customer, also set the status to Waiting. That way, the board also shows who’s waiting for what.

Removing the date entirely

If the task doesn’t have a specific day, delete the date with the x icon next to the date box and click “Save scheduling”. The task becomes “No date”; it doesn’t appear in the counters or on the calendar, and no notifications are sent. The date can’t be deleted on recurring tasks; turn off recurrence first.

The “Save scheduling” button doesn’t appear.

The button appears only when you make a change. Make sure you actually changed the date. If you don’t have permission to edit the task, the scheduling fields are read-only.

Can I postpone multiple tasks at once?

No, each task’s date is changed from its own details panel.

If this guide didn't help, write to us and we'll add what's missing.

Ask on WhatsApp